When looking back, we feel proud, because we have finished many prestigious projects that add value to our credibility.
 
 
LIST OF WORK DONE BY MR. K. M. ELIAS BETWEEN 1968 & 1984.
1 1968 Minor building works in Irrigation Project, Kuttiady, Calicut.
2 1970 Construction of 15 Nos. houses for Girinagar Colony, Ernakulam
3. 1970 Various works in Kerala Water Authority - O/H water tank of 5 lakh ltrs. Capacity, R.C.C well cum pump house, 9mtr. dia, infiltration gallery, C.I. Pipe line and systems in Arthat, Ollukkara panchayats and Kunnamkulam Municipality
4. 1973 Construction of IRC Grade-I bridge and approach road on national highway, near Kechery, Trichur Dist.
5. 1977 Construction of Irrigation canals for Irrigation Department, Kallada Project, Kottarakkara.
6. 1983 Pipe line works for Ranny Panchayath, Kollam Dist.
LIST OF MAJOR WORKS COMPLETED
1.Project Construction of 10 storeyed residential Appartments - Trans Avenue at Kakkanadu Ernakulam
  Description Spread Footings, Area: 50,000 sft with 32 flats
  Client M/S Transland Resorts Kakkanadu Ernakulam
  Architect M/S Santhosh & George Associates Ernakulam.
  PAC 110 Lakhs with materials
  Duration 15 months(1994 December - 1996 March)
2.Project Construction of 14 storeyed residential Appartment - Vrindavan palace at palace road Trichur
  Description Pile Foundations, Area: 84,000 sft with 52 flats
  Client M/S Vrindavan Appartments PVT Ltd Ernakulam
  Architect M/S Jayachandran Murali & Associates Trivandram.
  PAC 158 lakhs(Without cost of cement & steel)
  Duration 18 months (1996 January - 1997 December)
3. Project Construction of 7 storeyed two star Hotel complex at Trichur.
  Description Strap Footings, Area: 30,000 sft with cellar
  Client K.V Ibrahimkutty (M/S Ruby Queen Enterprises Aluva)
  Architect M/S Chandy consultants Trichur'.
  PAC 87 lakhs with materials
  Duration 8 months (1997 October - 1998 June)
4.Project Construction of residential building at Ooty.
  Description Spread Footings, Area: 5,000 sft with two floors
  Client Mr. Babu Sait Ooty.
  Architect M/S Jayachandran & Associates Trivandrum
  PAC 50 lakhs
  Duration 4 months (1998 January - 1998 May)
5.Project Construction of Amusement park "Dream World" water park at Chalakudy Trichur.
  Description Entrance gateway with 12,000 sft. 4 - storeyed Tower with area 16,000 sft and pile foundations. Wavepool with 10,000 sft area. Eight different types of landing pools for slides with area varying from 3,000 sft to 15,000 sft and one Lazy river with 250 m andd 3m width.
  Client M/S Kanjirappilly Amusement park and Hotels Pvt. Ltd, Trichur.
  Architect Mr. Remesh Warrier, Symbol creativity studio, Trichur.
  PAC 150 lakhs (Without cost of steel & cement)
  Duration 12 months (1998 November - 1999 November)
6.project Construction of 3-storeyed Hotel building Highway Palace, Pattikkadu, Trichur.
  Description Spread Footings, Area: 12,000 sft
  Client Mr. Mohan Kumar and Mr. John Thomas at Pattikkadu, Trichur.
  Architect M/S Chandy consultants, Trichur
  PAC 40 lakhs with materials
  Duration 4 months (1999 November - 2000 March)
7.Project Construction of 3 Nos Hostel Buildings at Trichur
  Description Spread Footings, Area 35,000 sft.
  Client Mr. P.C. Thomas at East Fort, Trichur.
  PAC 85 lakhs (without steel & cement)
  Duration 14 months (2000 October - 2002 January)
8.Project Construction of Indoor court and Auditorium at Anchery, Trichur
  Description Spread Footings, Area: 25,000 sft
  Client Mr. Paulson at Trichur.
  Architect M/S Chandy consultants, Trichur
  PAC 30 lakhs (With out materials)
  Duration 5 months (2000 January - 2000 June)
9.Project Construction of 3 - Storeyed Shopping complex at Kunnamkulam, Trichur
  Description Mat foundations, 3,000 sft with cellar
  Client Mr. Abdul Rahmann & Others at Kunnamkulam, Trichur
  Architect M/S Chandy consultants, Trichur
  PAC 101 lakhs (With out materials)
  Duration 3 months (2001 April - 2001 July)
10: Project Construction of 4 - Storeyed Shopping complex 'POOJA TOWERS' at Pudukkad, Trichur
  Description Spread footings, Area: 12,000 sft with cellar
  Client Mr. C. Mohandas at Pudukkad, Trichur.
  Architect M/S Chandy consultants, Trichur
  PAC 40 lakhs (Without materials)
  Duration 4 months (2001 February - 2001 June)
11 Project Construction of 7 storeyed Hotel complex "CEE PEE TOWERS" (Gold Plaza) at P.O Road, Trichur
  Description Mat foundations, Area : 25,000 sft
  Client Mr. C.P. Bava Haji, Edappal.
  Architect M/S Chandy Consultants, Trichur.
  PAC 100 lakhs (Without materials)
  Duration 12 months (2000 April - 2001 April)
12 Project Construction of Institution Building & Hostels at Elamthuruthy, Trichur
  Client Prof. P.C Thomas at East Fort, Thrissur
  Description Spread footings
  Duration 6 months (2002 July - 2002 Decmber)
  PAC 40 Lakhs (Without steel & Cement)
WORKS DONE BY NOBLE TECH UNDER MR. K.M. ELIAS.
1 1985 Construction of Social Forestry Institute, at Arippa.
PAC: 65 Lakhs.
2 1985 Construction of Chest Branch for State Bank of Travancore, at Devikulam,
PAC: 60 Lakhs
3 1991 Construction of Divisional Office, for Social Forestry Institute at Idukki.
PAC : 30 lakhs
4   Construction of Factory building at Cochin Export Processing Zone.
PAC: 2 Crores.
From 1991 to 1998, he has been undertaking various works of Southern Railway, under Thiruvananthapuram division
1 Construction of platform & railway track at Kollam Railway station for Southern Railway.
PAC: 25 lakhs
2 Construction of over head tank at Kottayam for Southern Railway
PAC : 5 lakhs.
Project Ongoing
1.Project Construction of Shopping Complex for Josco Fashion Jewellers, at Palace Road, Trichur
  Client Mr. P A Jose, Josco Jewllers, Kottayam
  Architect M/S Chandy Consultants Trichur
  PAC 70 lakhs
2.Project Construction of Press Building & Guest House at Thrikkakara
  Client S.T. Reddier & Sons Publishers Ernakulam
  Architect M/S PKR Menon & Associates, Ernakulam
  PAC 100 Lakhs(Witthout materials)
3.Project Construction of Club House & Swimming Pool at Trichur
  Client Trichur Tennis Trust, Trichur
  Architect M/S Chandy Consultants Trichur
  PAC 40 lakhs